CDA DV 710 Especificações Página 27

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 36
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 26
27
Installation "A" between Existing Side Cabinets (560 or 600 mm GAP)
(figs. 24, 25, 26, 28)
Mount the 2 (two) metal supports B (supplied with the
appliance in a separate kit) as indicated in Figs. 25 or 28).
Fig. 28 only - prepare 2 wood uprights A (width 20-50
mm, thickness 18 mm, length 650 mm); mount the 2 wood
uprights “A” to the cabinet walls as indicated in figure.
Build in the double oven making it slide on the metal
supports “B”.
Installation "B" between Side Cabinets by
Removing Provious Housing (figs. 27, 28)
– Remove previous housing.
Mount the 2 (two) metal supports B (supplied with the
appliance in a separate kit) as indicated in Fig. 28.
Prepare 2 wood uprights A(width 20-50 mm, thickness 18
mm, length 650 mm); mount the 2 wood uprights “Ato the
cabinet walls as indicated in figure.
Build in the double oven making it slide on the metal
supports “B”.
Fig. 25
(*) Measure calculated from the
underneath of the worktop to the top
support base of the Bsupports.
560 mm Gap
560 mm Gap
Installation “A
Fig. 24
Vista de página 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 35 36

Comentários a estes Manuais

Sem comentários